Thursday, October 13, 2011

Paver project update

The paving project is off to a slow but sure start.  Sure because that is the way hardworking perfectionists do things.  Slow because that is the consequence of being a hardworking perfectionist.  So the prep work took four days, even with Robby helping as he had time.  

 The hard working perfectionist. 

 The inevitable glitch, discovering the pillars are not sitting on their foundations, a construction mis-measure we are guessing, so part of the porch had to be left in place which meant all new leveling. 

 Piles of materials, and the van stuck inside for the duration.

Just imagine how gorgeous it will be. 